Pile Pulling & Pile Extraction Across Alberta
Complete Pile Removal
We pull the full piling out of the ground instead of cutting it off at the surface. That way, no steel is left buried to cause problems during reclamation or a future site inspection.
Facility & Lease Piling Removal
Pilings from wellsites, compressor stations, pipe racks, tank pads and buildings are a common leftover after decommissioning. We remove them as part of a full site cleanup, like our Pine Creek facility decommissioning, or as a standalone job. Wayco can handle:
- Facility and building pilings
- Pipe rack and equipment skid pilings
- Wellsite and lease pilings
- Large sites with hundreds of pilings
Less Damage to Your Site
The unit runs on a skid steer, so it's compact, easy to move around a lease and lighter on the ground than excavating each pile. Less disturbance means less work at the reclamation stage.
Quick Start Times
Most of our decommissioning work is planned months ahead. Pile pulling isn't. If you've got pilings that need to come out, call us and we can usually have our pile puller on your site within days.
